Biodiversity in long-running solar parks

Project title: Assessment of the ecological features in established solar parks

Focus

  • Development of a nature conservation assessment basis
  • Measures to promote biodiversity
  • Recommendations for site selection, design, and maintenance of future ground-mounted photovoltaic installations

Contact

ANUVA Stadt- und Umweltplanung GmbH
Nordostpark 89
90411 Nürnberg

Funding

FKZ 3525 86 0600
Departmental research plan BfN
Term 01.10.2026 – 31.07.2029

The research project investigates under which conditions solar parks in the long run (over 20 years) can promote biodiversity.

Objectives

Based on two years of field studies, guided interviews, and an analysis of literature and monitoring reports, the project will develop recommendations for site selection and for the design and maintenance of future solar parks, with a focus on long-term ecological conservation goals. From these, it will derive proposals for measures to promote biodiversity and to improve the landscape appearance. In this way, the project aims to clarify future prospects for long-established ground-mounted photovoltaic systems (PV-FFA), i.e. solar parks.

Approach

The project is divided into three work packages (WP). WP 1 establishes the basis for the nature conservation assessment, WP 2 covers field studies at ground-mounted PV systems (PV-FFA), and WP 3 consists of an operator survey on future plant operation.

WP 1: This work package creates the scientific foundation of the R&D project. It includes a systematic international literature review focusing on the possible effects of long-established PV-FFA on biodiversity. In parallel, a list of potentially relevant plant sites is compiled.

WP 2: Building on available literature and monitoring reports, field studies will be carried out at an estimated four long-established PV-FFA, and the results will be professionally evaluated. The focus is on the vegetation and fauna of the PV sites in relation to site-specific characteristics.

WP 3: This work package uses operator surveys to assess future developments of existing plants. Together with the results from WP 1 and WP 2, it will draw conclusions on the future development of existing installations and recommendations for the sustainable, nature-compatible further development of ground-mounted PV systems. These will be compiled in a final report.

Projectmanagement

ANUVA Stadt- und Umweltplanung GmbH
Nordostpark 89
90411 Nürnberg

Projectpartner

Arbeitsgruppe für regionale Struktur- und Umweltforschung GmbH - ARSU
Kreyenstraße 41
26127 Oldenburg 

Funding

Federal Agency for Nature Conservation (BfN)
Leipzig Office, Alte Messe 6, 04013 Leipzig

Topics

Solar energy and biodiversity   

Keywords

Related News

Monitoring reports and field surveys sought for an ongoing expert assessment of birds, bats, sand lizards and field hamsters

November 7, 2024, 10:00 a.m.–4:00 p.m., Tagungszentrum im Haus der Bundespressekonferenz, Berlin

6 November 2024, 3.00–5.30 pm, Conference Centre at the Federal Press Conference Building, Berlin & online via livestream

Related Projects